Skip to main content
Property.ie

Riverview House, Meenatarriff, Newmarket, Co. Cork, P51 E658

4 Bed · 3 Bath · Bungalow

€350,000

B E R C
Property typeBungalow
Street ViewSatellite View

DNG Ryan are delighted to present Riverview House, Meenatarriff, Newmarket, Co. Cork, to the market for sale. This impressive four-bedroom, three-bathroom detached bungalow extends to approximately 164 sq.m. and occupies a beautifully maintained, private site of C. 1.1 acres. Presented in excellent turnkey condition, the property offers an exceptional opportunity to acquire a spacious family home in an attractive countryside setting, within easy reach of Newmarket town. Built circa 2002, Riverview House has been meticulously maintained and offers bright, well-proportioned accommodation throughout. The residence comprises four generous bedrooms and three bathrooms, complemented by comfortable living spaces ideally suited to modern family life. The property's excellent condition and thoughtful layout create a welcoming home ready for immediate occupation. A standout feature of Riverview House is its beautifully maintained gardens, which provide a wonderful sense of privacy and tranquillity. Set on approximately 1.1 acres, the grounds offer extensive outdoor space, with established lawns and attractive surroundings creating an ideal environment for outdoor entertaining, gardening or family enjoyment. The property is approached via a private driveway, while a separate shed provides useful additional storage. The residence benefits from a C-rated BER and is serviced by a Stanley oil-fired heating system, a private well with water softener and a BioCycle wastewater treatment system. Situated in the scenic countryside of Meenatarriff, Riverview House enjoys a peaceful rural setting while remaining conveniently located to Newmarket town, where a selection of shops, schools, sporting facilities and everyday amenities are available. The location offers an appealing balance of countryside living and accessibility. Offered to the market with no onward chain, Riverview House represents an excellent opportunity for purchasers seeking a substantial detached residence with generous grounds and the convenience of turnkey accommodation. Combining an attractive private setting, beautifully maintained gardens and spacious interiors, this property is sure to appeal to families and those seeking a quality countryside home. Entrance 5.1 x 1.8 timber flooring Kithcen 3.9 x 4.8 fitted units, tiles, Stanley, open plan Dining room 4.1 x 4.2 timber flooring, open plan, glass sliding door Living room 5.5 x 3.6 stove, bay window, timber flooring Utility room 2.1 x 3.1fitted units, tiled, back door Bedroom 3.6 x 3.7 timber flooring Bedroom 3.7 x 3.6 timber flooring Bathroom 3.9 x 2.1 floor to ceiling tiles, free standing bath, electric shower Bedroom 3.9 x 3.7 timber flooring, En suite 2.3 x 0.9 floor to ceiling tiles, electric shower Bedroom 4.9 x 4.1 timber flooring, bay window, built in wardrobes En suite 0.9 x 2.3floor to ceiling tiles, electric shower KEY FEATURES: 4 bed, 3 bath Detached Bungalow Bio cycle septic tank Well water with softener C. 1.1 acres Built C. 2002 Oil boiler off Stanley C. 164 sqm C rated BER Oil heating off stanley Turn key condition Beautifully maintained gardens These particulars have been prepared by DNG John Ryan and whilst every care has been taken to ensure that these are accurate and correct, we are not responsible for any errors, omissions, inaccuracies, if the property is let, sold or withdrawn from sale or if it is not suitable for your purpose. These particulars are for information only and are given under the strict understanding that they do not form part of any contract. Neither whole nor any part of this document or any reference thereto may be included in any public document, circular or statement nor published without the written consent of DNG John Ryan. PSL: 003615

BER Details

B E R C
BER Number104339593
Entered31/10/2026
Last updatedtoday

€350,000

4 Bed · 3 Bath · Bungalow

Mark O`Keeffe logo

Mark O`Keeffe

DNG John Ryan

56 Main Street,

Mallow,

Co. Cork

PSR Licence No. 003615

Similar properties in the area