Mourne View, Harbour Road, Clogherhead, Co Louth, A92KD59
3 Bed · 1 Bath · Bungalow
€550,000
Highlights
- Oil central heating
- PVC double glazed windows
- Large 0.4acre site
- Detached garage
- Spectacular panoramic coastal views
- Views of the Mourne mountains
- Overlooking Little Strand beach
- Endless potential
- Easy road access to deep water harbour (c.400m)
- Access to two boat slipways at harbour
Perched in an elevated position with breathtaking panoramic views across the stunning northeast coastline of Ireland and the Mourne mountains, this detached 3-bedroom bungalow offers a rare and exciting opportunity to create a truly exceptional home. Enjoying an enviable setting, the property captures sweeping vistas of sea and sky, providing an ever-changing backdrop that is forever inspiring. ‘Mourne View’, with an approximate floor area of 107m²/1,150 ft², boasts immense potential in the right hands to be transformed into a unique and stylish coastal retreat or permanent family home. The generous site area of c0.4 acres and prime positioning further enhance the possibilities for redevelopment or extension, subject to the necessary planning permissions. Ideally located less than 1km from the vibrant seaside village of Clogherhead, residents can enjoy easy access to a host of local amenities including welcoming bars, restaurant, convenience stores, and a well-regarded national school. The property also overlooks the renowned Blue Flag ‘Little Strand’ beach, perfect for coastal walks, swimming, and outdoor leisure. Clogherhead is Approx. 70km north of Dublin and within easy and quick access of the historic town of Drogheda which is only a 15-minute drive. Combining spectacular views, a sought-after location, and outstanding potential, this property represents a rare opportunity to secure a distinctive home along one of Ireland’s most picturesque coastlines. Viewing by appointment only with sole agents Sherry FitzGerald Lannon. Hall 1.81 x 4.38 Sitting Room 4.23 x 3.83 Family Room 3.47 x 3.64 Dining Room 3.66 x 3.55 Kitchen 2.45 x 2.61 Bedroom 1 4.23 x 3.83 Bedroom 2 3.02 x 3.75 Bedroom 3 2.73 x 3.00 Bathroom 1.81 x 2.26 TOTAL: Approx. 107 SqM/1150 SqFt Garages 10.40 x 4.60 TOTAL: Approx. 47.8 SqM/510 SqFt
BER Details
B E R D2€550,000
3 Bed · 1 Bath · Bungalow
Giles Belton
Sherry FitzGerald Lannon
42 Shop Street
Drogheda
Co Louth
PSR Licence No. 001554
Similar properties in the area
Mermaids View, Cruisetown, Clogherhead, Co. Louth, A92XH32
€565,000
4 Bed2 Bath187 m²BungalowB E R C2TWO PROPERTIES ON ONE PLOT, "Haven House", Keeverstown plus "Yellow Lodge" Keeverstown, Grangebellew, Co. Louth, A92T2F4
€695,000
5 Bed3 BathDetachedB E R C1Sheetland Lodge, Sheetland Road, Termonfeckin, Termonfeckin, Co. Louth, A92R9Y7
€850,000
7 Bed6 Bath396 m²DetachedB E R B3'Belwood H, Belcotton, Termonfeckin, Co Louth, A92C3N8
€850,000
6 Bed5 Bath392 m²DetachedB E R C1
