Skip to main content
Property.ie

Altachullion Lower, Swanlinbar, Co. Cavan, H14FC99

3 Bed · 1 Bath · Bungalow

€185,000

B E R C
Property typeBungalow
Street ViewSatellite View

Spacious 3 Bed/3 Reception Bungalow with Detached Garage on Elevated C. 0.61 Acre Roadside Site in Scenic Rural Area. An Ideal Home. Requires Some Cosmetic Improvements & Qualifies for Vacant Property Grant. C.8.5km to Amenities at Swanlinbar. For Sale By Private Treaty. The well laid out living accommodation extends to C. 103 sqm/1,100 sqft and comprises; Entrance Hall, Snug Lounge (3.8 x 2.6) with open fireplace and double door leading to Sitting Room (4.0 x 3.3) with solid fuel stove, Modern Kitchen (4.0 x 3.7) with solid fuel range & Hot Press, Dining Room (4.0 x 2.9), Rear Hall (1.8 x 1.0), Shower Room (1.8 x 1.8), Bedroom 1 (4.7 x 3.0), Bedroom 2 (3.2 x 3.0) and Bedroom 3 (2.7 x 2.7). The is a large detached garage/workshop (8.8 x 5.7) with double door entrance and externally accessed store room (1.7 x 1.7). Constructed in 1984, the bungalow is of standard block construction with tile roof, plaster exterior finish and uPVC double glazed windows and doors. Fully habitable but requiring cosmetic renovation & upgrades in some rooms. Those seeking more space can extend up to 45sqm the rear, exempt from planning permission. The property also qualifies for the Vacant Property Refurbishment Grant & SEAI Energy Efficiency Grants amongst others. Serviced by: Electrical connection, Corlough Group Water Scheme connection, Oil fired central heating & On-site septic tank. Fibre broadband connection available. BER: C. This 0.61 acre freehold site is located in an elevated & scenic location with extensive frontage onto the R200 & with panoramic views over the surrounding countryside. The mature parcel has large garden areas, concrete drive & yard providing ample off-street parking & complete with a large 8.8 x 5.7 (50sqm) detached garage & workshop. Providing great potential for gardeners & those seeking a place to work from home. Situated in the Unesco Cuilcagh Lakelands Geopark, along the R200 in a scenic rural location 8.5km to amenities in Swanlinbar. C.15 min drive to Ballyconnell and approx. 30 min to a wide range of amenities in Enniskillen & 40 mins to Cavan Town. Convenient to Brackley Amenities, Cuilcagh Boardwalk, Shannon Pot & Shannon-Erne Blueway. 2 Hours to Belfast & Dublin. GPS: 54.157358, -7.775463. Viewing Highly Recommended & By Appointment Only.

BER Details

B E R C
Entered25/9/2026
Last updated2 days ago

€185,000

3 Bed · 1 Bath · Bungalow

James Spring

REA Donohoe Spring

REA Donohoe Spring

The Conall Building

Main Street

Ballyconnell

Co. Cavan

H14 HP59

PSR Licence No. 003483

Similar properties in the area